Project description:
It is the final part of a hydroelectric generation unit located in the Paute river basin, in conjunction with the Mazar, Molino and Sopladora hydroelectric plants. The project has pre-feasibility, feasibility, design and environmental impact studies for the bidding process. The planned investment is approximately US $ 1,215 million, with a generation capacity of 547 MW. This does not include the costs of a transmission line, whose costs are estimated at US $ 80 million.